Digging out the South Side



Blackhead quarrying update, I’ve been taking progress photos for months, but not posted. The main sequence above is 15months of quarrying and lowering on the south side of the quarry which is the face that is seen from Blackhead Road and the carparks. Heaps of activity and changes, the one big thing is the disappearance of what I call ‘the slip’ which was clay slide shaped like an arch.

Advertisements